Summer Roadwork

Summer road maintenance is scheduled June-August. The scheduled repairs extend the life of a road at a reduced cost. To find out where crews are working, check the map below.

Roadwork map

Residential projects

During the summer, routine maintenance is scheduled to limit the impacts of sun want water by repairing cracks, patching the pavement and applying a slurry seal. 

Slurry seal work

A slurry seal is the application of water, asphalt emulsion, aggregate (small, crushed rock) and additives to existing pavement. This method is used to preserve and protect the underlying pavement structure.

What to Expect

This project will take three weeks to complete and will resurface 93 streets. See impacted neighborhoods below. 

Work hours

  • July through August
  • Work hours: 7:00 am-5:00 pm

Temporary road closure

  • The street will be closed to all traffic. 
  • 24-48 hours before work begins, “No Parking” signs are placed on your street. The signs will include the dates of construction.
  • The road will be closed to all traffic. Crews will clear the street and complete street sweeping. 
  • The seal will be wet and sticky when the slurry is applied. Slurry needs as much as 4-6 hours to cure, depending on weather. Until the seal cures, the street will be closed to all users, including bicyclists, pedestrians and pets. 
  • A cone will be placed at each driveway to indicate the street is closed to all traffic.
  • Do not attempt to leave your driveway during this time. 
  • The contractor will remove the cone when the street is reopened. 

Please note: Vehicles parked on the street during construction will be towed. Every effort is made to contact residents prior to the construction date. If your vehicle is towed, contact the Gresham Police Department at 503-618-2318.

Notification

  • A postcard is mailed to residents prior to scheduled work. 
  • Postcard notices are sent to residents two weeks prior to scheduled work.
  • 24-48 hours before the work begins, "No Parking" signs are placed on your street. The signs will include the dates of construction. 
  • A door hanger with more information will be delivered at the time no parking signs are posted. 

Please note: Vehicles parked on the street when paving is scheduled, may be towed at the owners' expense. 


Garbage service

The City is coordinating work with local garbage haulers. If work is scheduled on your garbage day, we recommend putting your roll carts out early to allow haulers to collect garbage prior to road work.

Scheduled Neighborhoods

Crews will be working throughout Gresham to repair local streets. Check the roadwork map for up-to-date information on locations and scheduling. 

Work is scheduled for the following neighborhoods:

  • Centennial
  • Central City 
  • Gresham Butte
  • Historic Southeast
  • Hollybrook
  • North Gresham
  • Northwest
  • Rockwood
  • Southwest
  • Wilkes
Project Description

Slurry seal

A slurry seal work is weather dependent. If it rains, work will be rescheduled. Check the roadwork map to see where crews are working.

Maintenance steps

Preparation

  • Cracks in the pavement are sealed with an adhesive sealant.
  • Patch repairs are made where areas of the pavement have failed.
  • Lane striping or markers are removed approximately 7 days before the slurry is applied and replaced soon after.

Clean sweep

  • Street must be clear of all vehicles.
  • The day the work is scheduled, the street is cleaned with street sweepers before the seal work begins.

Slurry Seal

  • The slurry seal is applied to the entire street.
  • The seal takes 4-8 hours to dry. It is important to stay off the road during the dry time. The road will continue to improve as traffic rolls in the new seal.

Major roadway paving projects

Crews are paving sections of four busy streets ("arterials") this summer. Paving requires lane closures and detours. Plan ahead and go slow in the zone. Check TriMet bus schedules for any route or stop changes during construction.

Night paving 

West Powell Blvd. (between Eastman Parkway and Gresham City limits)

What to expect

  • When: Starting in August. For specific dates, check the roadwork map
  • Night paving: 7:00 pm - 6:00 am
  • Streets will be closed to traffic during paving. Watch for street signs and detours for alternative routes. 

Work phases

Work will be completed in three phases.

Life of a road

Roads have a life span and the life cycle of a road is affected by many factors, including weather, traffic volume and the maintenance efforts that go into preserving the road as long as possible.  When a road reaches the end of its life – when surface damage becomes so severe that the road bed is destroyed – it becomes necessary to replace the road, which costs up to $120 per square yard.